हाथ से कॉलम टूट गया ? column banane ka sahi tarika | rcc column checklis... - Veer Buildhouse

Hot

Saturday, June 19, 2021

हाथ से कॉलम टूट गया ? column banane ka sahi tarika | rcc column checklis...

हाथ से कॉलम टूट गया ? Column Banane Ka Sahi Tarika | Rcc Column Checklist For House Construction 



Checking of column before concreting

Size as per drawing.
Diagonals as required.
Oiling of shuttering.
Plumb on both sides.
Line of columns as desired.
Sufficient Marking level up to which concreting to be done.
Supports.
Reinforcement cover provided.
Spacing of reinforcement above concrete level, maintained as required.
Proper filling of gaps from outside by soil paste.


Checking of column while concreting.

Quality of materials of concrete.
The proportion & mixing of material.
Six cube mould are kept ready to cast cubes from different batches.
Controlled water cement ratio.
Availability of vibrator or labour for tamping.
Proper cover after concreting on top level.
Casting of concrete cubes as required.
Proper numbering on cubes.
Fill joints if slurry flows from anywhere.
Maintain required concrete level.
Cleaning of mixing platform.


Checking of columns after concreting.

De shuttering of columns after 24 hrs-48 hrs.
Submission of the de shuttering report to higher authority.
Finishing of honey combing, if any, with proper care.
Date of casting written on column.
Hacking of columns.
Cubes removed next day & kept for curing, with code numbers, cast code, site name on cubes.
Curing of columns done for minimum 15 days. Wet nesian cloth wrapped around it.
Testing of cubes on due dates i.e. after seventh & twenty eighth day.