STEPS OF CONSTRUCTION
WORK
- TYPES
OF BUILDINGS: -- First select the type of building whatever we want to construct ,
depending on the needs like villas, flats, apartments, penthouses, malls,
industrial buildings or group housing.
- SITE
SELECTION :-- Site for construction
of buildings can be selected according to the space required and whatever
the area and the people demands, in accordance with the population and
bearing of soil keeping in mind the geographical and industrial point of
view for further development.
- SURVEY:
-- This includes many aspects like financial survey, economical survey,
topographical survey etc.
- SITE INVESTIGATION: -- By this we investigate
about the type of soil, bearing capacity of soil, nature of the bed,
ground water level, the topographical feature of the area, which in turns
helps the Structural designer to design the footing of the project.
- ARCHITECTURAL DRAWINGS: -- Architectural
Drawings are the heart of the project, which is the master document or the
copy with which we have to stick completely and accordingly. These
Drawings have all the plans and construction details about the particular
projects.
- STRUCTURE DESIGN: -- It infuses the correct data and
interprets the correct meaning which an engineer knows. It suggests the
type of foundation , column, beams, slabs etc. which are needed for the
construction and also provides the amount of steel and its size.
No comments:
Post a Comment