INSPECTION OF PCC - Veer Buildhouse

Sunday, September 30, 2018

INSPECTION OF PCC



INSPECTION OF PCC


    We inspected the PCC by performing following check or steps:--
  • We check the dimensions of form work of PCC before mixing concrete.
  • We check polythene sheet is laid over PCC bed or not.
  • Checked the concrete slump (maximum slump should be 75mm).
  • Checked the thickness level of PCC before casting by putting steel pegs in concreting area or putting level pillar of fresh concrete at suitable distance.

No comments:

Post a Comment