INSPECTION OF PCC
We inspected the PCC by performing
following check or steps:--
- We check
the dimensions of form work of PCC before mixing concrete.
- We check
polythene sheet is laid over PCC bed or not.
- Checked
the concrete slump (maximum slump should be 75mm).
- Checked
the thickness level of PCC before casting by putting steel pegs in
concreting area or putting level pillar of fresh concrete at suitable
distance.
No comments:
Post a Comment